2/12/2024 0 Comments Free instals90 t, consequently had to be adapted to the ground conditions.” The design of the Cantilever Reclaimer, with a total weight of approx. “The SCHADE equipment needs to move safely despite table edges and foundation slabs that had shifted during the long period of operation. Hans-Joachim Delank, Project Manager at SCHADE Lagertechnik, comments: Due to the low ceiling height of the building, the assembly of the new equipment had to be carried out while the plant continued to operate normally. The materials are conveyed from here to the onward process of the cement plant. ![]() ![]() In the very compact hall FGD gypsum and limestone are stored on two stockpiles. The equipment had to be integrated into the existing infrastructure and adapted to the design of the building, which had been constructed in the 1970s. The order presented a challenge on several levels. With the support of AUMUND Group Field Service the installation was supervised and the machines were commissioned within an extremely tight timeframe. SCHADE was responsible for the engineering, design, fabrication, and supply. ![]() An old machine in Gorazdze, Poland, had been in operation for many decades, and was to be replaced by a SCHADE Cantilever Reclaimer with the conveying capacity doubled to 400 tph, and an associated belt conveyor.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |